BOP Bridge Crane, Winches and Tuggers

Drilling Equipment Inspections

How often
BOP bridge crane trolley hoists, hydraulic winches and air tuggers: Category I daily, Category II monthly, annual OSHA inspection. Crane hooks and hoist chains: daily visual and a monthly certification record. Hoist upper limit switch: tried at the start of each operator's shift.
Source: Nordic PM Plan 9.0 Table 4 (note **); OSHA 29 CFR 1910.179(j)(2) and (n)(4)(i)
📋 Inspection Information
📏 Readings
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

BOP bridge crane and trolley hoists
All operating mechanisms work with no maladjustment
Source: OSHA 29 CFR 1910.179(j)(2)(i)
No deterioration or leaks in air or hydraulic lines, tanks or valves
Source: OSHA 29 CFR 1910.179(j)(2)(ii)
Hooks: no deformation or cracks
Source: OSHA 29 CFR 1910.179(j)(2)(iii)
Hoist chains and end connections: no excess wear, twist, distorted links or stretch
Source: OSHA 29 CFR 1910.179(j)(2)(iv)
Upper limit switch tried with no load at the start of the shift
Source: OSHA 29 CFR 1910.179(n)(4)(i)
Rated load marked and legible from the floor
Source: OSHA 29 CFR 1910.179(b)(5)
Monthly hook and chain record signed with date and hook / chain ID (answer N/A on a daily check)
Source: OSHA 29 CFR 1910.179(j)(2)(iii), (iv)
Winches and air tuggers
Wire rope: no broken wires over the limits, kinks, crushing or bird-caging
Source: API RP 54 (4th ed.) 7.5.2, 7.5.4
Guards in place on drives
Source: API RP 54 (4th ed.) 6.3.2, 6.3.3
Brake holds the load
Source: Nordic PM Plan 9.0 (Category II: adjustment)
No leaks, corrosion or loose or missing parts
Source: Nordic PM Plan 9.0 (Category II)
Annual OSHA inspection current
Source: Nordic PM Plan 9.0 Table 4 note **
Rigging and pad eyes
Slings carry legible ID (size, grade, rated capacity, reach)
Source: API RP 54 (4th ed.) 7.6.9
Rigging color-coded for the current inspection year; synthetic slings carry the 6-month line
Source: Nordic R4 Lifting and Hoisting Guidelines 5.0; Nordic PM Plan 8.0
Shackles for overhead lifting carry a serial or lot number traceable to the annual inspection
Source: Nordic R4 Lifting and Hoisting Guidelines 5.0
Pad eyes in use are on the lift register with their number and SWL marked
Source: Nordic PM Plan 10.0 (Appendix A)