Choke and Kill Manifold and Mud Gas Separator

Drilling Equipment Inspections

How often
Choke manifold valves, chokes, HCR, kill and choke line valves: Category I daily, II weekly. Valve greasing and external checks before every BOP pressure test. Poor boy degasser: Category I daily, III annual; flush and drain the U-tube at the end of each well. Remote choke panel, choke manifold and MGS U-tube gauges: calibrated annually.
Source: Nordic PM Plan 9.0 Table 2 and Table 2 inspection criteria; Nordic PM Plan Appendix B 11.9; API Std 53
📋 Inspection Information
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Choke and kill manifold
Lined up for normal operations: manual valves open, HCRs shut
Source: Nordic R4 Testing 13-5M BOP 7.0 step 14
Choke manifold can be lined up to the mud gas separator through the manual choke
Source: Nordic R4 Mud Gas Separator Procedure (key points; step 2)
Valves greased per the R4 gate valve greasing procedure; greasing done before any BOP test
Source: Nordic R4 Gate Valve Greasing Procedure; Nordic PM Plan 9.0 Table 2 criteria
Valves operate fully open and closed; handles in place
Source: Nordic PM Plan 9.0 Table 2 (choke manifold valves)
Manual and hydraulic chokes function; remote choke panel works
Source: Nordic PM Plan 9.0 Table 2 (manual and hydraulic chokes)
Remote choke panel casing and drill pipe gauges calibrated within 1 year
Source: Nordic PM Plan Appendix B 11.9 (API Std 53 6.2.2.16)
Choke manifold gauge calibrated within 1 year
Source: Nordic PM Plan Appendix B 11.9
HCR valves function; position indicators match
Source: Nordic PM Plan 9.0 Table 2 (HCR)
Grayloc / Oteco clamps on choke, kill and shock hoses: no damage; studs and nuts complete
Source: Nordic PM Plan 9.0 Table 2
No leaks; protected for the weather (freeze protection)
Source: 20 AAC 25.527(b); Nordic PM Plan 9.0 (Category II)
Mud gas separator (poor boy)
Inlet line blown down and clear
Source: Nordic R4 Rig Start-Up 11.0 step 2
Float functions
Source: Nordic R4 Rig Start-Up 11.0 step 3
Butterfly valve functions
Source: Nordic R4 Rig Start-Up 11.0 step 4
U-tube gauge calibrated within 1 year
Source: Nordic PM Plan Appendix B 11.9
U-tube flushed and drained at the end of the last well
Source: Nordic PM Plan 9.0 Table 2 (Poor Boy degasser)