Nordic-Calista

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
← Back to Portal

Crown Saver Function Test

Drilling Equipment Inspections

How often
At least once per tour and whenever the device is moved or altered, with the result documented. Also before the first stand of every trip and after every slip and cut. Record on the IADC report. The PM Plan also lists the Crown-O-Matic as a Driller daily item and a monthly Category II.
Source: API RP 54 (4th ed.) 7.3.7; Nordic R4 RIH/POOH SOPs (manually check the crown saver before the first stand, record on the IADC report); Nordic R4 Slip and Cut Drilling Line 9.0 step 3; Nordic PM Plan 9.0 (Crown-O-Matic verified per operational procedures and documented on the IADC tour sheet) and Table 5; Nordic PM Plan 5.0 Table 3
A crown saver that fails is a stop. Do not trip until it is fixed and retested. Tell the Driller and the Rig Manager now.
📋 Inspection Information
📏 Readings
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Before the test
Floor clear; no one riding the man rider; Driller at the console
Source: Nordic R4 Slip and Cut Drilling Line 5.0 step 6 (man riding personnel clear before the blocks move)
Blocks empty for the test (no stand in the elevators)
Source: Nordic R4 RIH/POOH SOPs (check before running or pulling the first stand)
Function test
Blocks raised into the set point; the Zone Management crown saver stopped them below the crown
Source: Nordic R4 Slip and Cut Drilling Line 9.0 step 3; API RP 54 (4th ed.) 7.3.7
Crown-O-Matic checked per the Crown-O-Matic set point adjustment procedure in the drawworks manual
Source: Nordic R4 Slip and Cut Drilling Line 3.0 and 9.0 step 3
Peco Zone Management and Pason block height match where the blocks really are (calibrate if needed)
Source: Nordic R4 Slip and Cut Drilling Line 9.0 steps 4, 5 and 7
Crown saver reset and back in service after any work in the drawworks
Source: Nordic R4 Slip and Cut Drilling Line 4.0
Result entered on the IADC report
Source: Nordic R4 RIH/POOH SOPs; Nordic PM Plan 9.0; API RP 54 (4th ed.) 7.3.7
📝 Findings & Actions
AnthroSafe™ Field Driven Safety
© 2026 SLP Alaska, LLC