Deadline Anchor Inspection

Drilling Equipment Inspections

How often
Wire line anchor (all rigs other than Rig 3): Category I daily, Category II weekly, Category IV every 5 years (working days). Appendix B 11.7 adds a weekly / monthly / annual / 5-year program written for the NOV deadline anchor; follow the Rig 4 anchor OEM manual where it differs.
Source: Nordic PM Plan 9.0 Table 1 (Wire line anchor, all other rigs); Nordic PM Plan Appendix B 11.7; API RP 8B; API RP 54 (4th ed.) 7.5.6
📋 Inspection Information
📏 Readings
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Every check
Slippage mark above the uppermost deadman bolts has not moved
Source: Nordic R4 Slip and Cut Drilling Line 9.0 step 8
Line seated correctly in the anchor drum groove
Source: Nordic PM Plan Appendix B 11.7 Category I item 2
No loose bolts; clamp studs and nuts in place
Source: Nordic PM Plan Appendix B 11.7 Category I item 3; Nordic R4 Slip and Cut Drilling Line 7.0 step 11
Load cell: no unusual deformation; secured to the line by a secondary safety device
Source: Nordic PM Plan Appendix B 11.7 Category I item 5; API RP 54 (4th ed.) 7.9.4
Anchor base fastened to the substructure; no visible cracks or deformation
Source: Nordic PM Plan 9.0 (Category II); API RP 54 (4th ed.) 7.5.6
Category II (weekly; answer N/A on a daily check)
Anchor drum surface: no wear
Source: Nordic PM Plan Appendix B 11.7 Category I item 1
Clamp bolt torque checked against the anchor drawing or Rig 4 Slip and Cut Section 11.0 (360 ft-lb on the 7/8 in. studs)
Source: Nordic PM Plan Appendix B 11.7 Category I item 3; Nordic R4 Slip and Cut Drilling Line 7.0 step 11
All parts on the assembly drawing present and in good working condition
Source: Nordic PM Plan Appendix B 11.7 Category II item 2
Load cell inspected per its sub-manual
Source: Nordic PM Plan Appendix B 11.7 Category I item 6
Corrosion, lubrication and loose or missing parts checked
Source: Nordic PM Plan 9.0 (Category II)