Nordic-Calista

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
← Back to Portal

DROPS Dropped Object Survey

Drilling Equipment Inspections

How often
With each Mast/Derrick inspection (2 times per month) and after any work aloft, before the blocks move.
Source: API RP 54 (4th ed.) 7.1.13(a)(3) and (b); Nordic R4 Mast/Derrick Bi-Weekly Inspection; Nordic Fall Protection Policy (D. Inspections: dropped objects program)
📋 Inspection Information
📏 Readings
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Fixtures and fittings aloft
Light fixtures have safety cables to the frame
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Windwalls 2; Derrick Structure 3)
Signs: mounts secure, pins and safety clips in
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Windwalls 3)
Structure pins have safety clip retainers
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Derrick Structure 2; Monkey board 7; Belly Board 3)
Windwall panel and slide rail fasteners in place
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Windwalls 1; Derrick Structure 5)
Snatch block shackles have their securing devices
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Crown Block 4)
Sheave line guards secure
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Crown Block 2)
Crown bumper blocks secured
Source: API RP 54 (4th ed.) 7.1.14
Top drive covers and bolted parts have secondary retention
Source: API RP 54 (4th ed.) 7.1.13; DROPS Reliable Securing
Boards and platforms
Finger safety chains in place; fingers straight
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Monkey board 3, 4)
Stabbing board and each finger have secondary retention
Source: API RP 54 (4th ed.) 7.2.14
Board safety cables to the A-leg in place
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Monkey board 6; Belly Board 2)
No loose items on the crown, water table, boards, walkways or derrickman's cabin
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Crown Block 7; Monkey board 2)
Platforms secured against dislodging
Source: API RP 54 (4th ed.) 7.2.11
Counterweights, load cell and tools
Counterweights above the floor have a safety chain or wire rope line to the derrick
Source: API RP 54 (4th ed.) 7.1.15
Tong counterweight frame fasteners tight
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Derrick Structure, board to floor 5)
Weight indicator above the floor fastened; load cell has its secondary safety device
Source: API RP 54 (4th ed.) 7.9.4
Tools used aloft were tethered and inventoried, and all came back down
Source: API RP 54 (4th ed.) 7.1.13(a)
📝 Findings & Actions
AnthroSafe™ Field Driven Safety
© 2026 SLP Alaska, LLC