Nordic-Calista

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
← Back to Portal

Fall Protection, Derrick Escape and Man Rider

Drilling Equipment Inspections

How often
Fall protection: before each use. Harnesses and lanyards: Category I daily, II monthly, III annual. Geronimo escape line: Derrickman weekly, Category II monthly, IV every 3 years. Man rider winch: before each use, Category I daily, and an annual OSHA inspection.
Source: OSHA 29 CFR 1910.140(c)(18); Nordic PM Plan 9.0 Table 4 (with note **) and Table 5; Nordic PM Plan 5.0 Table 2; Nordic R4 Manrider Winch 4.0
📋 Inspection Information
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Harnesses and lanyards
Harness webbing: no frayed edges, broken fibers, pulled stitches, cuts or chemical damage
Source: Nordic Fall Protection Policy (PFAS Harness Inspection 1)
D-rings and wear pads: no distortion, cracks, breaks or sharp edges; D-ring pivots freely; rivets tight
Source: Nordic Fall Protection Policy (PFAS Harness Inspection 1)
Buckles not distorted; tongues and rollers move freely
Source: Nordic Fall Protection Policy (PFAS Harness Inspection 2, 3)
Lanyard snaps: no distortion, cracks or corrosion; keeper seats and the spring closes it firmly
Source: Nordic Fall Protection Policy (Lanyard Inspection 1)
Annual (Category III) inspection current on harnesses and lanyards
Source: Nordic PM Plan 9.0 Table 5
Derrickman's belt, lanyard and fall protection device in good condition
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Monkey board 1)
Derrick escape (Geronimo)
Escape line anchored and its route kept clear of obstructions
Source: API RP 54 (4th ed.) 6.12.1
Installed per the manufacturer
Source: API RP 54 (4th ed.) 6.12.3
Escape line wire rope: fewer than 3 broken wires in any one lay and no broken wire at the end connection
Source: API RP 54 (4th ed.) 7.5.3
Escape buggy: no defects
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Monkey board Wind wall 3)
Derrickman's escape door hinges free
Source: Nordic R4 Mast/Derrick Bi-Weekly Inspection (Monkey board Wind wall 2)
Man rider (Tirak hoist)
Man rider / derrick work permit open; Rig Manager notified; Rig Manager or Driller on the floor
Source: Nordic R4 Manrider Winch 3.0 and 5.0 step 1
Area under the man rider clear of people
Source: Nordic R4 Manrider Winch 3.0
Hoist and cable inspected before use
Source: Nordic R4 Manrider Winch 4.0
Hoist run to prove it works before anyone rides
Source: Nordic R4 Manrider Winch 5.0 step 3
Rider on self-locking 5,000 lb carabiners with a climbing lanyard on the back D-ring for self-rescue
Source: Nordic R4 Manrider Winch 2.0 and 5.0 step 4
At least one spotter assigned; operator has reviewed the Tirak operating instructions
Source: Nordic R4 Manrider Winch 5.0 step 5
Tirak emergency descent lever with the hoist; DBI Sala rescue equipment and red and blue rescue winches ready
Source: Nordic R4 Manrider Winch 2.0, 7.0 and 8.0
Annual OSHA inspection of the man rider winch current
Source: Nordic PM Plan 9.0 Table 4 note **
📝 Findings & Actions
AnthroSafe™ Field Driven Safety
© 2026 SLP Alaska, LLC