Nordic-Calista

Checking sign-in…

Job Setup:Set once. Attaches to every form you submit.
← Back to Portal

Fire and Emergency Equipment (Monthly)

Drilling Equipment Inspections

How often
Fire extinguishers: monthly, date and initials recorded; serviced by a qualified third party at least yearly. SCBA: inspected monthly and before and after each use; annual flow test; 5-year hydro. Emergency showers and emergency lighting: monthly. Plumbed eyewash and showers: activated weekly. Rig ESD: annual.
Source: Nordic Fire Extinguisher Procedure 4.0 to 6.0; OSHA 29 CFR 1910.157(e)(2), (e)(3); OSHA 29 CFR 1910.134(h)(3); Nordic PM Plan 9.0 Table 5; ISEA Z358.1
📋 Inspection Information
📏 Readings
✅ Checklist

Answer every line. N/A means it does not apply today. Every Fail needs a note saying what is wrong.

Fire extinguishers
In the designated place
Source: Nordic Fire Extinguisher Procedure 4.0 step 1
Access and visibility not blocked
Source: Nordic Fire Extinguisher Procedure 4.0 step 2; API RP 54 (4th ed.) 5.1.4
Nameplate operating instructions legible and facing out
Source: Nordic Fire Extinguisher Procedure 4.0 step 3
Safety seals and tamper indicators intact (if broken, check whether it was discharged)
Source: Nordic Fire Extinguisher Procedure 4.0 step 4
No physical damage, corrosion, leakage or clogged nozzle
Source: Nordic Fire Extinguisher Procedure 4.0 step 5
Gauge in the operable range
Source: Nordic Fire Extinguisher Procedure 4.0 step 6
Full, by weighing or hefting
Source: Nordic Fire Extinguisher Procedure 4.0 step 7
Monthly date and initials recorded on the tag, checklist or electronic record
Source: Nordic Fire Extinguisher Procedure 5.0; OSHA 29 CFR 1910.157(e)(2)
Annual third-party maintenance tag current
Source: Nordic Fire Extinguisher Procedure 6.0; OSHA 29 CFR 1910.157(e)(3)
Hydro test date within its interval (cartridge-operated extinguisher shell: 12 years; the N2 cartridge itself: 5 years; compressed gas extinguishers: 5 years)
Source: Nordic PM Plan 9.0 Table 5
SCBA and escape packs
Inspected this month and before and after each use
Source: OSHA 29 CFR 1910.134(h)(3)(i)(B)
Cylinders full; recharged when below 90% of rated pressure
Source: OSHA 29 CFR 1910.134(h)(3)(iii)
Annual flow test current; cylinder hydro within 5 years; composite cylinders under 15 years of service
Source: Nordic PM Plan 9.0 Table 5
SCBA and eyewash bottles in their normal positions
Source: Nordic R4 Rig Start-Up 26.0 items 2 and 3
Eyewash, shower and first aid
Emergency showers inspected this month
Source: Nordic PM Plan 9.0 Table 5
Plumbed eyewash and showers activated weekly
Source: ISEA Z358.1; API RP 54 (4th ed.) 4.5.2.3
Pit eyewash station installed
Source: Nordic R4 Rig Start-Up 26.0 item 1
First aid kit stocked and available
Source: API RP 54 (4th ed.) 4.5.3.2
Lighting, shutdowns and communication
Emergency lighting works
Source: Nordic PM Plan 9.0 Table 5; Nordic PM Plan 5.0 Table 3 (monthly)
Engine combustion-air shutdowns function-tested per company procedure (record the date)
Source: API RP 54 (4th ed.) 7.13.1, 7.13.2
Rig emergency shutdown (ESD) annual check current
Source: Nordic PM Plan 9.0 Table 5; Nordic PM Plan 5.0 Table 3
Intercom (Gaitronics) works
Source: Nordic PM Plan 5.0 Table 3
Escape routes, air pack locations and muster areas known and clear
Source: Nordic R4 Emergency Evacuation Procedure 5.0 and 10.0
📝 Findings & Actions
AnthroSafe™ Field Driven Safety
© 2026 SLP Alaska, LLC