How often
Calibrate and test when the BOP stack is first installed after rig-up, at every AOGCC-witnessed BOP test, and at least every 30 days. A system that self-checks continuously is function-tested at those times and at least every 6 months. PM Plan: H2S and methane detectors Category II weekly (Electrician); portable monitors monthly.
Source: 20 AAC 25.066(b); Nordic PM Plan 9.0 Table 2 and Table 5; Nordic PM Plan 5.0 Table 2